PAT 1700/3000 BIG LOADS (PLATFORM FOR TEMPORARY ACCESS INTO THE SHAFT)

Platform for BIG DEPTH shafts for the guides installation phase. It avoids hiring scaffolding in all the entire vertical shaft that interrupts the elevator assembly process because they must be installed and then uninstalled by external companies. The elevator assembly procedure does not depend on external companies.

Description

PRODUCT DATASHEET

The lifts installation in a shaft entails notable risks of falls when dealing with vertical work at height. At present, for big depth shafts, elevator companies use scaffolding along the entire vertical of the shaft as auxiliary equipment when installing the guides. This process requires the participation of external companies authorized for its assembly, for several days. Once the guides and traction machine have been installed, the elevator company must temporarily abandon the work so that the specialized company dismantles the scaffolding, temporarily paralyzing the elevator assembly procedure. This operation also represents a significant financial outlay for the installation company or the builder. Installation becomes more expensive, and assembly times are extended due to the intervention of third parties in the process. These drawbacks are solved with the PAT 1700/3000 weighing only 56 Kg, and which allows access to the upper part for elevators with shaft depth from 1700 mm to 3000 mm. It is supplied with a pole to eliminate occupational hazards, and to facilitate its introduction into the shaft from the landing. It is available Conformity declaration, User manual, Technical sheet.

Patented and certified product.

 

 

Reviews

There are no reviews yet.

Be the first to review “PAT 1700/3000 BIG LOADS (PLATFORM FOR TEMPORARY ACCESS INTO THE SHAFT)”

Your email address will not be published. Required fields are marked *

You may also like…